Meta has announced Petal, an approximately 7,000-kilometre subsea cable between France and the United States. Planned for 2029, it targets one petabit per second, twice the capacity of today’s leading transoceanic systems according to the company.
The short answer
| Question | Answer |
|---|---|
| When will it enter service? | Meta is targeting 2029. |
| Who is involved? | Meta, NEC, Sumitomo Electric and Orange for the French landing. |
| Which technology is used? | Multi-core fibre intended to increase capacity without doubling the entire physical system. |
The cloud runs through glass on the ocean floor
Subsea cables carry the overwhelming majority of intercontinental traffic. Messages, backups, video and AI requests cross physical fibres. Petal is a reminder that digital-service growth depends on ships, repeaters and landing stations as much as data centres.
An announced capacity leap
Meta describes Petal as the first transoceanic system to reach a petabit per second. Multi-core fibre is intended to multiply optical paths within a controlled footprint. Commercial capacity will still depend on lit spectrum, terminal equipment and access agreements.
France becomes a strategic landing point
Orange is supporting the landing on France’s Atlantic coast. A new route can improve diversity and reduce dependence on a few corridors if its path and interconnections provide genuine redundancy. Resilience is ultimately tested during simultaneous failures.
Capacity, sovereignty and platform power
Private investment improves available connectivity, but also gives large platforms a growing role in global infrastructure. Operators and regulators need to examine access, security, repairability and competition rather than focusing only on the advertised peak capacity.




Join the discussion
Comments
Loading comments…